Calculation for a site / Moscow and region
Stairs and guardrails
Moscow
Fabrication of industrial stairs, access crossovers and guardrails from shop drawings.

Work input checklist
Stairs and guardrails
- 01start and finish levels
- 02access-route and opening plan
- 03interfaces with existing structures
Site logistics checklist
Moscow and region
- 01vehicle access rules
- 02unloading slot and area
- 03allowable shipping-element dimensions
What this calculation does not confirm
Clear width, pitch, guarding and egress requirements must be defined by the design.
Next step
Send the drawing, specification and unloading conditions for an initial order review.
- 01
- start and finish levels
- 02
- vehicle access rules
- 03
- flights and landings